Producing the drawings for the structural alterations involved translating early‑stage concepts into accurate, buildable technical information. This required assessing the existing conditions, coordinating with structural engineers, and ensuring that all proposed interventions aligned with safety standards, regulatory requirements, and the wider design intent.